午夜专区,佐山爱一区二区在线观看免费,久久中文香蕉视频,国产欧美一区二区精品秋霞影院

    <li id="hol4r"></li>
    <li id="hol4r"></li>
  1. <thead id="hol4r"><optgroup id="hol4r"></optgroup></thead>

        1. <label id="hol4r"></label>

        2. Lanmec has Jiangsu torque measurement and control technology R & D center, torque sensor division, dynamometer division and tension division

          Service hotline:

          400-111-3688
          Location:Home > Products
           Introduction of reducer test bench (click to enter)
           Hits:6429 AddTime:2022/4/30 9:49:39




          Equipment Name: Reducer Test Bench

          Equipment introduction: The reducer test bench is to study the transmission performance of various gear transmissions, belt transmissions and continuously variable transmissions.

          Important equipment for evaluating product quality. Through the test, the rationality of the design of the transmission device, the manufacturability of processing, manufacturing, assembly and debugging can be checked. The in-depth analysis of the test results will help to understand and evaluate the comprehensive mechanical properties of the transmission components and devices, and also provide practical reference materials and design basis for engineering designers.

          Measurement parameters: input torque, speed and power of the reducer;

          Output torque, speed, power;

          Conversion efficiency

          Vibration, noise, temperature rise, etc.

          Measurement accuracy: torque, speed, power, reducer efficiency ±0.2%F.S

          Temperature ±0.2℃

          Loading method: magnetic powder brake loading, hysteresis brake loading, eddy current brake loading, power feedback loading

          Installation method:

          The large bottom plate adopts HT200 cast iron platform (return processing), and the surface is ground to ensure that the flatness is less than 0.05mm. Install shock absorbing pad and level adjustment horn under the platform;

          The reducer under test is installed on the sliding platform separately, which can be moved forward and backward and locked separately, which is convenient for installing the reducer; ensure the installation concentricity ≤0.03mm

          Coupling: the use of elastic pin (diaphragm, plum, pin) type coupling.

          The reducer under test is installed on the sliding platform through a bracket, using the same mounting bracket, and different flanges and couplings are replaced for different models.

          The specific structure is communicated by both parties, and the drawings determined by both parties shall prevail

          Software function:

          It is used to test various parameters of servo motor, drive and planetary reducer.

          Various parameters can be displayed, stored and printed by computer and instrument; and the curve relationship between each parameter can be displayed, stored and printed

          Can be loaded manually, program-controlled loading; program control of the speed, time, etc. of the active motor

          Final acceptance

          After the equipment has been commissioned on site by Party A, both parties will conduct final acceptance of the machinery, electrical and software of the equipment. After passing the test, both parties will sign and confirm, and the unqualified items will continue to be rectified until they are qualified.

          After-sales service

          Within 12 months after the acceptance of the dynamometer (the torque and speed sensor is 24 months), if all components and instruments fail

          (Non-artificial) Three guarantees will be implemented. The courier replacement that can be replaced by courier, and the phone can be resolved by phone. If it cannot be solved, Party B must arrive at the site of use within 24 hours. For equipment failures caused by reasons other than Party B, material costs, road expenses, and labor hours will be charged at cost. After 12 months, Party B will arrive at the site to use the paid service within 24 hours.

          Commissioning training

          After receiving the call from Party A to request debugging, Party B must arrive at the demand site within 48 hours, and the debugging is completed within 3 days. During this period, the operator can be trained free of charge.

          【Refresh】【Favorites】【Print】 【Close】
          Previous:Planetary reducer test bench Next:Traction machine test bench (click to enter)